Depth is measured below the underside of the slab, so nothing gets counted twice.
| Mark | Shape | Qty | W / dia | Length | Depth | CY |
|---|
Lean mix under the pads. Counted in the total but usually ordered on its own ticket.
Mix cost covers concrete only. Rebar, vapor barrier, base rock, forms, pump, and labor sit outside this number.
Budget takeoff only. Slab thickness, footing sizes, pad sizes, and reinforcing are set by the engineered plans.
Apex Steel Buildings LLC · 530-319-5306